Bunker Renovation Update
It’s been another productive week on the course! Despite an inch of rain
Monday afternoon, the construction crew is wrapping up work around the 13th
green.
Joel was on-site Monday to make final adjustments before shaping and
drainage. On Tuesday, the team installed the drainage and gravel layer,
followed by application of the Better Billy Bunker polymer on Wednesday. Sand
was added Thursday morning, and 10,000 square feet of rough sod will be
installed Friday. The hole is expected to be fully complete by next Tuesday.
| Gravel layer and drainage complete |
| Spraying the Better Billy Bunker Polymer |
| Sand in the bunkers |
Erosion and sediment control work on hole 16 is scheduled for Friday and
Saturday.
Tarps Removed
We removed the growing tarps from the short game area and the driving
range on Tuesday and Wednesday. These tarps protect the Bermuda grass during
the winter and give us a head start preparing the range tee for early spring
play.
| Pulling the tarps off the range tee |
| Left side cover by tarp and right side not! |
Sod Work Near Staging Area and #1 Tee
After several dry days, we were finally able to prepare the area near the
cart staging area for new sod. We removed old turf, added 40 tons of soil, and
regraded the surface to create a cleaner, more polished look. Please avoid
walking on the new sod until it’s fully rooted—thank you for your cooperation.